You need to enable JavaScript to run this app.
AODN Portal
East Spar First Post-commissioning Survey Report.
Updated: 2017-11-21
East Spar First Post-commissioning Survey Report.
Data
Full metadata link
Related records
East Spar Benthic Survey. Biological Monitoring Program.
The potential of seismic noise to damage lobster larvae and reduce further harvest
Marine seismic surveys - a study of environmental implications.
Analogue site survey report for Apache Energy Ltd. Stag- 8.
Environmental Sensitivity Assessment, Lynedoch-2 NT/P48.
Environmental Baseline: Laminaria Field and Adjacent Reefs of the Sahul Shelf
East Spar Gas Field Long Term Environmental Monitoring Programme. Pre-production survey.
East Spar Biological Monitoring, First post-commissioning survey.