Survey 97 : Operations Report for the Joint BMR/Woodside Petroleum High Resolution Seismic Program in the Dampier Sub-Basin, October 1990

Updated: 2026-07-23

Seismic acquisition for the joint BMR-Woodside Petroleum program in the Dampier Sub-basin started at 0800 am on October 24, 1990 and was completed at 1150 am on Sunday October 28, 1990. A total of 352 km of high resolution seismic data was collected along the 17 agreed survey lines, of which 336 km were full stack data with a total 390 magnetic tapes being used. Data quality appears to be good. In addition to the seismic, a total of 530.6 km of water column geochemical data were also collected.