NESP TWQ Project 3.6 - Establishing a research framework for future NESP investment into better understanding of the presence of Box-Jellyfishes (Irukandji) and risks in the Great Barrier Reef, 2015-2016 (JCU)
Updated: 2026-06-25
This project intends to conduct a workshop with key researchers and stakeholders to establish the future research framework for NESP investment into better understanding of box-jellyfishes presence and risk in the Great Barrier Reef. This will include defining the scope of work required to: identify how species of Irukandji and stingers respond to changing water quality conditions, predictions of box-jellyfishes presence based on environmental conditions, determine ecological impacts, innovative management options. We will engage with stakeholders to discuss scientific information already available, research gaps to be filled and develop a framework to guide future NESP research to meet end-user needs.
Data
- Project page
- NESP TWQ Hub
- Department of Climate Change, Energy, the Environment and Water - National Environmental Science Program website
- Full metadata link
- http://i.creativecommons.org/l/by/4.0/88x31.png
- http://creativecommons.org/licenses/by/4.0/
- {"title":"National Environmental Science Program Tropical Water Quality (NESP TWQ) Hub - Funding Program - 2015 - 2020 (Dept. of the Environment and Energy)","recordAbstract":"This metadata is a brief overview of the National Environmental Science Program Tropical Water Quality (NESP TWQ) Hub. \nThe aim of the National Environmental Science Programme (NESP) is to assist decision-makers to understand, manage and conserve Australia’s environment by funding world-class biodiversity and climate science. \nThe National Environmental Science Programme is delivered through six research hubs: \n* Clean Air and Urban Landscapes Hub, \n* Earth Systems and Climate Change Hub, \n* Marine Biodiversity Hub, \n* Northern Australia Environmental Resources Hub, \n* Threatened Species Recovery Hub \n* Tropical Water Quality (TWQ) Hub \nThe NESP TWQ Hub is the largest of the hubs and provides innovative research for practical solutions to maintain and improve tropical water quality from catchment to coast under three research themes:\n\n* Theme 1 – Improved understanding of the impacts, including cumulative impacts, and pressures on priority freshwater, coastal and marine ecosystems and species\n* Theme 2 – Maximise the resilience of vulnerable species to the impacts of climate change and climate variability by reducing other pressures, including poor water quality\n* Theme 3 – Natural resource management improvements based on sound understanding of the status and long-term trends of priority species and systems\n\nEach theme is broken down into a number of projects, each of which has an experienced Program Leader. The NESP is built on lessons learned from the National Environmental Research Program (NERP) which concluded in 2014.\n\nThe funding for the NESP TWQ program is provided in a number of rounds.\n\nRound 1 (June 2015 - Mar 2016)\nThis round funded 25 short term projects starting in June 2015. All projects were completed by March 2016. Many of the projects were associated with desktop studies, synthesis of historic work or workshops to facilitate planning of future research. A few of the projects were continuation of long running monitoring projects including the AIMS LTMP, the JCU inshore coral reef monitoring and the eAtlas. \n\nRound 2 (Jan 2016 - Dec 2018)\nThe NESP Round 2 research projects aligned with the priorities of the Reef 2050 Long Term Sustainability Plan and Reef Trust. This round consisted of multi-year project funding which commenced in January 2016, and funded 18 projects. The projects are aligned with the 3 NESP research themes and were grouped under 7 priorities:\n* Priority 1: Reducing water quality impacts: Identify and prioritise practical management actions capable of protecting and improving water quality in the Great Barrier Reef region.\n* Priority 2: Water quality monitoring and reporting\n* Priority 3: Protecting the Reef: Crown-of-thorns starfish\n* Priority 4: Reducing potential impacts: Dredging activity\n* Priority 5: Impact of water quality and climate factors on economically relevant reef species\n* Priority 6: Protection of identified Reef systems of high biodiversity value\n* Priority 7: Supporting traditional co-management\n\nRound 3 (Jan 2017 - Dec 2019)\nThe NESP Round 3 research projects commenced in January 2017, with research priorities were further narrowed via consultations with end users, stakeholders and the Department of Environment and Energy. The 15 projects funded for Round 3 grouped under three key priorities:\n* Priority 1: Water Quality Improvement\n* Priority 2: Improved Monitoring/Reporting/Assessment\n* Priority 3: Improved Management of Key Species/Habitats\n\nRound 4 (Jan 2018 - Dec 2020)\nThe NESP Round 4 projects commenced in January 2018. This round responded to the significant events in the Great Barrier Reef in 2006-2017 including mass coral bleaching and impacts of Cyclone Debbie. The focus of the NESP TWQ hub projects shifted towards direct intervention and management in the marine environment. All projects are aligned with the 3 NESP research themes, with higher priority given to specific issues. Additionally, 4 cross cutting issues were highlighted and integrated across multiple NESP hubs. These cross-cutting issues are: \n* 1. consider current and future climate risks in the research design, delivery and recommendations, as appropriate, as recommended by the State of the Environment Report 2016 \n* 2. consider the social and economic value of the environmental asset/s and research outcomes, as appropriate \n* 3. where possible, and where other considerations are equal, be targeted at areas with high conservation value such as National and World Heritage places and Ramsar wetlands \n* 4. be designed with consideration of how it may intersect and integrate with the priorities of other NESP hubs.\n\nFor the Round 4 research plan, the 12 projects can be grouped under three headings:\n* 1. Supporting Direct Interventions in the Marine Environment \n* 2. Informing Reef Management in a Post-Bleaching/Increased Cyclone Frequency World \n* 3. Improving Water Quality Emanating from Catchments\n\nRound 5 (Jan 2019 - Dec 2020)\nRound 5 projects continue to focus on the research priorities outlined in Round 4. Many of the 15 projects in this round are extensions to previously completed or existing projects under previous rounds. \n\nFull project details and reports from each Round can be found on the NESP TWQ website. The eAtlas has project pages for those projects that produced new datasets that have been published in the eAtlas.\nData Location: the datasets generated from each project are saved in the eAtlas enduring repository at e-atlas\\data\\NESP-TWQ-(1-5). All NESP TWQ data is available for download from the eAtlas"}
- {"title":"NESP TWQ Project 4.7 - Indigenous Coral Reef Tourism, 2019-2019 (CQU)","recordAbstract":"Despite the seemingly abundant opportunities, Indigenous Traditional Owners of the Great Barrier Reef appear to show little interest in participating in the lucrative coral reef tourism industry. This project seeks to understand why this is so, canvass TO attitudes to the industry, map out the opportunities for their participation in both mainstream and Indigenous-initiated ventures, and provide an assessment of current obstacles and what can be done to mitigate them. Research will be undertaken through a combination of surveys (e.g., of tourism industry literature), consultations with TO groups and regulatory authorities, and interviews with mainstream tourism operators (and their representative bodies). The project will result in a report with recommendations relevant to TO groups interested in coral reef tourism, mainstream tourism stakeholders and enterprises, industry bodies and regulatory and management authorities."}
- {"title":"NESP TWQ Project 3.3.1 - Quantifying the linkages between water quality and the thermal tolerance of GBR coral reefs, 2017-2019 (AIMS)","recordAbstract":"This project will deliver two outcomes: (i) understanding of how water quality (WQ) exposure affects the ability of corals to resist and recover from bleaching, (ii) a modelling framework to identify management options that would mitigate the effects of warming on reefs exposed to WQ pressures. Using SeaSim experiments and field data, we examine which WQ parameters (nutrients/light/turbidity) affect corals’ thermal tolerance, and assess how temperature and WQ exposure histories affected coral bleaching and recovery during the 2016 bleaching event. We will refine the eReefs model to derive WQ management scenarios expected to maximize coral survival in a warming climate."}
- {"title":"NESP TWQ Project 3.2.4 - Defining, assessing and monitoring Great Barrier Reef aesthetics, 2017-2017 (CSIRO)","recordAbstract":"A key criteria for inscription of the Great Barrier Reef as a World Heritage Area is Criteria (VII) – exceptional natural beauty & aesthetic importance. Our project will work across social and ecological disciplines to identify, for the first time, indicators that will enable managers to measure and monitor aesthetic values for the GBRWHA. The outcomes will enable managers to predict and minimize aesthetic impacts below, at and above the water within the World Heritage Area, support implementation of the Reef 2050 Long-Term Sustainability Plan and improve decision processes relating to approvals, impact assessment, strategic planning, incident response and policy development. The indicators will be additionally tested using Artificial Intelligence via project 3.2.3."}
- {"title":"NESP TWQ Project 3.13 - eAtlas 2015 - NESP data management, Torres Strait NRM plan delivery platform and Torres Strait reef mapping, 2015-2015 (AIMS)","recordAbstract":"This project involves preparing, publishing, and visualizing approximately 50 recently submitted datasets, making them available through the eAtlas and the AODN.\n\nThis proposal covers the activities of the eAtlas in 2015 (July - December). These are:\n\n1. The eAtlas has approximately 50 datasets that were recently submitted for review that are awaiting preparation, publication and visualization. This project will complete the publication process for these datasets making them available via the eAtlas and with spatial datasets also being made available via the AODN.\n2. Work with 1st round NESP TWQ projects to capture any new relevant data products for inclusion in the eAtlas and provide training sessions on providing data in the right format. \n3. Support and continue training in the use of the Torres Strait eAtlas6 with Torres Strait Regional Authority (TSRA) so it can be used as a publishing platform for their new Land and Sea Strategy NRM plans.\n4. Work with TSRA to complete the Torres Strait reef mapping, started under the NERP TE, so that it can be used by GBRMPA to process the Torres Strait coral monitoring data (RHIS)."}
- {"title":"NESP TWQ Project 3.3 - Light thresholds for seagrasses of the GBR: a synthesis and guiding document for managing seagrass, 2015-2015 (JCU)","recordAbstract":"Light levels (i.e. water quality/turbidity) can be managed to minimise seagrass losses. Recent attempts to define threshold levels of light required to maintain GBR seagrass state has resulted in a spectrum of recommendations with no single definitive source document to guide regulation. We will compile the available information on light thresholds into a guiding document, which will become a key reference for managers and regulators to use in generating relevant water quality guidelines and conditions for developments such as dredging programs. It will also highlight research information needs and provide interim guidelines for immediate management application."}
- {"title":"NESP TWQ Project 5.2 - From exposure to risk: Novel experimental approaches to analyse cumulative impacts and determine thresholds in the Great Barrier Reef World Heritage Area (GBRWHA), 2019-2020 (AIMS)","recordAbstract":"Understanding cumulative impacts from multiple stressors will be critical for successful management of the Great Barrier Reef (GBR) under the Reef2050 Plan. This project produced experimental analyses of concentration-response relationships for selected species under broad, controlled envelopes of local stressors at different climate scenarios. Results informed assessments of ecological risks, and management opportunities for a range of activities in the coastal zone and on the GBR. In the project-extension used exposure maps and ecological models, based on our developed and existing databases and experimental results, advancing our understanding of the contribution of individual disturbances in a cumulative framework (including both acute and chronic disturbances) to the current status of the reef. In turn, this new knowledge will inform management on setting future water quality thresholds, identifying catchments and regions as priorities for management action aimed at ameliorating impacts to reef health and building resilience for large-scale cumulative disturbances."}
- {"title":"NESP TWQ Project 4.9 - Gully Characterisation Framework to underpin GBR Catchment Water Quality Management, 2018-2018 (GU)","recordAbstract":"In this project we will compile a database of gullies from across Queensland as a tool for communicating the diversity of gullies that exist in the landscape, but also the sommon elements from within this diversity, where they exist. Using this database we will develop a gully classification system to ensure that there is a common language used by researchers, land holders, land managers and practioners when identifying gullies for management intervention. This will also form the basis for subsequent automated gully mapping according to gully type. We will also develop a first order decision tool to guide land managers towards the sorts of management options that may be appropriate for the gullies in question. Whilst this will not be a design guideline, it will help to ensure that the range of management options are narrowed down by managers before specialist advice is sought. A checklist of design considerations will also be developed that will ensure that managers undertake the appropriate level of design work for the required intervention. To some extent this project will document and formalise the knowledge and decision making processes that are currently undertaken by the specialst technical advisory team to the Reef Trust Programme."}
- {"title":"NESP TWQ Project 1.3 - A validation of coral geochemical records to reconstruct suspended sediment loads to the Great Barrier Reef lagoon, 2015-2016 (JCU)","recordAbstract":"While coral geochemistry records are widely cited as evidence for increased suspended sediment loads delivered to the Great Barrier Reef since the 1850s, there has been little replication or quantification of the records. Indeed, most records are based on cores collected prior to the year 2000 when limited catchment monitoring data existed to ‘validate’ the interpretations that certain trace element ratios provided proxies of annual sediment loadings. This project will analyse the geochemistry of coral cores collected in 2012 from sites in the central GBR and compare the ratios to measured sediment and particulate nutrient loads from the Burdekin River."}
- {"title":"NESP TWQ Project 2.2.2 - Impacts of mine-derived pollution on Torres Strait environments and communities, 2016-2017 (CSIRO)","recordAbstract":"This study addresses concerns regarding the impacts of mine-derived pollution on the marine resources of the Torres Strait. Using state of the art procedures, trace metal concentrations in marine waters and sediments will be determined at locations across the Torres Strait. Chemical signatures of mine pollution will be measured in waters and sediments and hotspots of contamination identified. The water quality data generated will allow informed management decisions to be made on how to best address trans-boundary mining related pollution."}
- {"title":"NESP TWQ Project 3.1.5 - Ecotoxicology of pesticides on the Great Barrier Reef for guideline development and risk assessments, 2017-2019 (AIMS)","recordAbstract":"Over 50 land-sourced pesticides have been detected in waters of the Great Barrier Reef (GBR) and its catchments. Previous studies on the risks posed by pesticides have focused on five priority PSII herbicides. However, other pesticides are increasingly being used, for which there are few fate, persistence and toxicity data. In order to improve water quality guidelines and assessments of the potential risks posed by these “alternate” pesticides to GBR and its catchments we will quantify their toxicity to freshwater and marine species."}
- {"title":"NESP TWQ Project 5.12 - Scoping land use conversion options for high DIN risk, low-lying sugarcane areas in Burdekin and Mackay Whitsunday regions, 2019-2020 (JCU)","recordAbstract":"The Reef 2050 Long-Term Sustainability Plan and Reef 2050 Water Quality Improvement Plan 2017-2022 have set ambitious targets for Great Barrier Reef (GBR) water quality improvement. Indeed, Water Quality Improvement Plans (WQIP) for most NRMs in the Great Barrier Reef catchments recognise that complete adoption of sugar cane best management practices will still not be sufficient to achieve the nitrogen load reductions required to meet the Great Barrier Reef (GBR) Water Quality Guidelines. Thus additional options need to be considered transitioning agricultural land to other uses is one of those options. Here we capitalise on existing evaluation frameworks developed in NESP TWQ Project 2.1.2, as we aim to;\n\n- identify possible alternate land uses in coastal low-lying cane land, that has a high DIN loss;\n- quantify the economic costs of changing land use, and market mechanisms to incentivise this transition (e.g. Reef Credits); and\n- explore benefits (e.g. farm profitability) of land transition.\n\nThis project will better define options land use change across two NRMs that have different climatic conditions, industry groups, water boards and potentially different land use transitions."}
- {"title":"NESP TWQ Project 3.1.1 - Implementation of the Crown of Thorns research strategy: regional strategies, 2017-2019 (CSIRO)","recordAbstract":"Crown-of-thorns starfish (COTS) management requires decisions be made about where to invest control effort in order to achieve regional scale objectives, e.g. to modify COTS spread or to facilitate coral recovery. However, no objective basis for choosing sites exists, beyond their economic importance, meaning that achieving these important goals is largely left to chance. This project will leverage past and current research to develop a decision support framework to assist in prioritizing reefs for control and for assessing alternative strategies by integrating the full range of ecological and management information available. Field and desktop research will also be conducted to fill critical knowledge gaps and to assess the prospects of new control technologies."}
- {"title":"NESP TWQ Project 2.2.3 - Early warning systems to minimize the risk of box jellyfish stings by empowering stakeholders, 2016-2018 (CSIRO)","recordAbstract":"This project will minimise the risk of box jellyfish stings by empowering stakeholders with an early warning system. The project will first develop an openly-accessible database based on information from existing sting datasets, hospital records, and surf lifesaving and research data. The project will use this database to develop real-time forecasting models in major stinger hotspots on the GBR, based on environmental conditions and water quality. These forecasts will be tested with the project partners, SLSQ and AMPTO. This project will empower tourism operators, Traditional Owners and the public to mitigate stinger impacts."}
- {"title":"NESP TWQ Project 4.2 - Oceanographic drivers of bleaching in the GBR: from observations to prediction, 2018-2020 (AIMS)","recordAbstract":"This project seeks to understand how local, regional and global oceanographic and meteorological processes influence the severity and spatial variability of thermally driven coral bleaching for the Great Barrier Reef (GBR) and Torres Strait. All available relevant environmental observations of the recent bleaching events will be gathered to be more easily discoverable to researchers and managers via a gateway/summary webpage. The data will be used to assess how well the eReefs models are modelling the recent warming during bleaching events and then analyse the reasons behind the variations of bleaching response. 3D versions of remotely sensed bleaching products by NOAA and BoM will be produced and a seasonal prediction capability for marine heatwaves will be developed."}
- {"title":"NESP TWQ Project 3.12 - Development of an offset financial contribution calculator for Reef Trust, 2015-2016 (UQ)","recordAbstract":"This project will progress an approach for incorporating environmental offsets into the Reef Trust through development of a prototype calculator to assist potential approval holders and relevant agencies in determining appropriate financial payments as offsets under the Reef Trust. It will extend the methodology currently used to calculate terrestrial offsets to the marine setting. It will delineate clearly the differences in applying such a calculator to the marine–catchment continuum and terrestrial settings. A draft prototype will be tested for its consistency with operational needs and practicality among key stakeholders."}
- {"title":"NESP TWQ Project 4.6 - Recommendations to maintain functioning of the Great Barrier Reef, 2018-2019 (UQ)","recordAbstract":"The Great Barrier Reef is experiencing increased environmental stress which threatens its functioning. Yet a subset of species are often disproportionately important in maintaining a functioning ecosystem. This project harnesses Queensland’s breadth of reef expertise to deliver timely recommendations on what can be done to strengthen and protect key supportive species. Specifically we ask which species – or functional groups of species – drive processes that maintain a healthy reef. We provide a scientific consensus in support of (1) species’ rankings and recommendations for enhanced protection, (2) informed scenarios for what’s at stake: the consequences of not taking further action, and (3) make recommendations for targeted R&D. We will also suggest activities that can be undertaken by citizen science organisations to help monitor the status of priority species or identify areas of either outstanding value or threat."}
- {"title":"NESP TWQ Project 5.5 - Measuring aesthetic and experience values using Big Data approaches, 2019-2020 (GU)","recordAbstract":"This research project responded to the urgent need of understanding how ecological changes affect the aesthetic value and the user experience of the Great Barrier Reef, and how these are measured and monitored in a cost-effective way. The research capitalised on two major trends, namely peoples’ ability and willingness to share large amounts of information through various online platforms, and rapid development in computing technology to store, process and interpret these data."}
- {"title":"NESP TWQ Project 2.1.3 - Harnessing the science of social marketing and behaviour change for improved water quality in the GBR: an action research project, 2016-2018 (JCU)","recordAbstract":"Working in partnership with staff from the Australian Government’s Department of the Environment (DotE), and the Queensland Government’s Departments of Science Information Technology and Innovation (DSITI) and Environment Heritage and Protection (DEHP), this project will use data collected from land managers and elsewhere to critically evaluate the way water quality (WQ) improvement programmes are ‘marketed’. It will use insights from those evaluations to inform the reconfiguration of marketing and engagement strategies associated with programmes scheduled for roll-out during 2017, demonstrating methods for monitoring and assessing the extent to which these different Programmes and changed strategies improve adoption and alter behaviours."}
- {"title":"NESP TWQ Project 2.3.5 - eAtlas - Data management for environmental research, 2016-2018 (AIMS)","recordAbstract":"Having ready access to the best available information, scientific knowledge and data is vital for evidence based environmental management and for science that builds on the prior work of others. The eAtlas is a web based knowledge and data management system for environmental research data. Its systems ensure that data is discoverable, publicly accessible and preserved for the future.\nThis project will allow the eAtlas team to work with NESP TWQ researchers to:\n* Assist and support them with data management guidance and training.\n* Ensure that hub data is well documented, accessible and reusable now and into the future.\n* Visualize spatial data allowing its use by management without specialized GIS software.\nThis project will also engage stakeholders to establish and implement refinements to the eAtlas systems to remove existing barriers to its broader use."}
- {"title":"NESP TWQ Project 1.5 - Legacy of the Lower Burdekin Water Quality Tender, 2015-2015 (JCU)","recordAbstract":"This project conducts an ex-post evaluation of a water quality tender (auction) project. In 2007-08, a water quality pilot tender was trialled in the Lower Burdekin River area, funded by the Australian Government through the National Market Based Instruments and co-funded and administered by the NQ Dry Tropics. This project will collaborate with NQ Dry Tropics and engage with tender participants to review design, operational, administrative and other matters of the trial. It will evaluate the effectiveness of the tender to achieve long-term change and identify strengths as well as opportunities for improvement. The research will inform economic theory and future tenders."}
- {"title":"NESP TWQ Project 3.1.4 - Optimizing the management of riparian zones to improve the health of the Great Barrier Reef, 2017-2018 (CSIRO)","recordAbstract":"This study uses evaluation of past investments to demonstrate effectiveness, and enable improved targeting, of riparian remediation works for reducing streambank erosion to achieve improved water quality outcomes within the Great Barrier Reef. By re-visiting previous riparian erosion-control investments we will identify what factors result in generating a functional riparian zone, including the conditions under which the investment occurred (rainfall zone, fencing arrangements, soil type, etc.), and the type of remediation revegetation (width of revegetation, connectivity of riparian area, species mix established, etc.). With stakeholder input, we will develop an initial framework to guide future investment in riparian remediation works."}
- {"title":"NESP TWQ Project 2.1.1 - Integrated Pest Management of Crown-of-Thorns Starfish, 2016-2018 (CSIRO)","recordAbstract":"Successful Crown-of-Thorns Starfish (CoTS) management will, for the foreseeable future, depend on manual control at specific sites being effective and efficient. This project will develop an Integrated Pest Management approach to site management, based on a detailed understanding of CoTS ecology and management operations, to protect coral and maximise performance of control activities at economically and ecologically important reefs. It will provide an intelligent, field-deployable decision support tool to guide strategic selection of control activities based on site conditions and management constraints. This approach will be underpinned by new, targeted field work focussed on improving management."}
- {"title":"NESP TWQ Project 2.1.9 - Risk assessing dredging activities, 2016-2018 (AIMS)","recordAbstract":"The project will use novel analytical techniques/instrumentation to accurately quantify, for the first time, key proximal stressors associated with dredging/spoil disposal (i.e. sedimentation, light quantity/quality, suspended sediment concentrations) and will determine how these parameters vary with increasing distance from dredging. We will then test the response of corals, sponges, seagrass and algae to environmentally relevant/realistic conditions over appropriate time-frames. Matrices of hard data will be generated to derive water quality thresholds for key habitat forming organisms and for use as input parameters for pressure field modelling (including cumulative-impact modelling). This will dramatically improve risk assessment processes, provide greater surety for regulators and proponents, allow more informed decision-making and inform future dredging policy."}
- {"title":"NESP TWQ Project 5.9 - Gully remediation effectiveness, 2019-2020 (CSIRO)","recordAbstract":"There is significant Government investment in water quality improvement focused on reducing gully erosion (~$50M), however, there is limited measured data to demonstrate the effectiveness of the remediation approaches. This project is collected land condition, terrain and water quality data from five gully remediation trial sites in the Burdekin catchment. The data demonstrated whether the on-ground investment programs are actually improving measured water quality, and quantified the cost-effectiveness of the various approaches. The measured field data was extrapolated using Lidar, supporting the prioritisation and evaluation of future remediation sites over larger (whole of property) scales. Communication products were developed to provide the evidence needed to increase landholder engagement in remediation programs that are focused on improving water quality runoff to the GBR.\n\nThis project is a continuation of NESP TWQ Round 2 - Project 2.1.4."}
- {"title":"NESP TWQ Project 4.4 - The traits of corals that survived recent bleaching events, 2018-2020 (AIMS)","recordAbstract":"The past two years have seen unprecedented coral bleaching on the GBR but the consequences on biodiversity and genetic diversity are not yet known. This project will address the following questions: \n\n1) Has bleaching resulted in a loss of genetic diversity in three coral species?\n2) Do surviving populations contain genetic signatures of adaptation to bleaching temperatures?\n3) What is the prevalence of heat tolerant photo-symbionts within surviving corals and in the environmental pool?\n4) Are heat tolerant Symbiodinium communities and host genetic variants correlated with ambient environmental and recent bleaching conditions? \n\nHigh throughput genomic sequence variance analysis will identify genes in corals and Symbiodinium types associated with bleaching tolerance. Through correlations with environmental variables we will develop a spatially explicit understanding of the distribution and abundance of stress tolerant coral genes and symbionts ( in hospite and free-living) to identify key coral populations for protection, key reefs for resilience management and potential breeding stock for use in reef restoration activities."}
- {"title":"NESP TWQ Project 1.10 - Identification, impacts, and prioritization of emerging contaminants present in the Great Barrier Reef and Torres Strait marine environments, 2015-2015 (AIMS)","recordAbstract":"Increased human activities in the GBR and Torres Strait regions are expected to increase the sources and diversity of contaminants in their marine environments. Here, we will (i) determine the presence and locations of emerging contaminants based on monitoring data and the types of human activities present, and (ii) prioritize the identified emerging contaminants based on their potential risk to these marine environments. Based on the list of priority emerging contaminants, we will develop and recommend key areas of research to inform management and policy decisions that will maintain and improve the condition of the marine environments in the GBR and Torres Strait regions."}
- {"title":"NESP TWQ Project 3.1.7 - Reducing sediment loads to the Great Barrier Reef: developing optimal approaches for treating alluvial gully erosion, 2017-2019 (GU)","recordAbstract":"Alluvial gullies have been shown to be major sources of fine sediment and nutrients to the GBR lagoon, and yet to date there is no accepted practice as to how these major pollution sources can be stabilised and rehabilitated. Working in collaboration with delivery partners implementing gully rehabilitation works through the Reef Trust phases 2 and 4, and various other gully mitigation programs currently being developed by Greening Australia, WWF and GBRF, this project will develop a series of large field trials that will test the effectiveness of different treatments for large active alluvial gully rehabilitation in different soil types in different catchments. These trials will complement similar research effort currently underway through NESP on hillslope gullies."}
- {"title":"NESP TWQ Project 3.4 - Developing and refining biological indicators for seagrass condition assessments in an integrated monitoring program, 2015-2016 (JCU)","recordAbstract":"Refinement of biological indicators for condition assessment is an immediate priority as highlighted in a recent review of the GBR Marine Monitoring Program (MMP). Seagrass carbohydrate content is an early-warning indicator of water quality impacts. Samples collected quarterly since 2008 will be analysed and used to establish baselines and optimize protocols for applying carbohydrates as an indicator for future monitoring. Furthermore, calibration formulae to convert seagrass percent cover, the principal condition indicator, to biomass will be developed allowing integration across programs critical for the Reef-wide Integrated Monitoring and Reporting Program. This project provides excellent value for money because samples have been collected in-kind."}
- {"title":"NESP TWQ Project 3.2.2 - The IMS 2050 Human Dimensions Project: cost-effective Indicators and metrics for key GBRWHA human dimensions, 2017-2018 (JCU)","recordAbstract":"Building on the work of the work of the GBR RIMReP Program Design Group, this project will develop cost-effective indicators and metrics for human dimension outcomes, objectives and targets in the Reef 2050 Plan, consistent with the Drivers-Pressures-State-Impact-Response (DPSIR) framework. It will add value to and ensure continuity with information collected through the Social and Economic Long-Term Monitoring Program for the Great Barrier Reef (SELTMP). The project will: determine potential and extant indicator sets; evaluate data collection cost-effectiveness; determine thresholds (where appropriate); and provide guidelines for a collaborative approach for developing grading scores, using multiple lines of evidence to rate progress towards Reef 2050 Plan targets, objectives and outcomes."}
- {"title":"NESP TWQ Project 3.3.3 - Defining the values of the ecological systems that influence the GBR and lie outside the marine park and world heritage area boundaries, 2017-2018 (JCU)","recordAbstract":"The Great Barrier Reef World Heritage Area (GBRWHA), globally recognised for its outstanding universal value, is an integrated and highly connected part of a larger northeast Australia marine bioregion, which includes Torres Strait, the Coral Sea and the Great Sandy Marine Park (Hervey Bay). Understanding the values (ecological, cultural, social and economic) of these adjacent systems, and especially the connections and interdependencies between systems, is crucial to effective and efficient protection and management of the globally important natural and cultural values within each system. This project will identify and assess the values of these adjacent systems, and characterise the processes and attributes that influence the values and their connectivity at a regional scale, delivering a resource that can inform cross-jurisdictional planning and management."}
- {"title":"NESP TWQ Project 3.1.8 - Innovative economic levers: a system for underwriting risk of practice change in cane-farming, 2017-2019 (CSIRO)","recordAbstract":"This project will enable reduced DIN exports from cane lands by developing and promoting a tested framework for commercial insurance businesses to underwrite risk of nitrogen practice change in sugarcane farming. We will work with insurance, other relevant businesses and, potentially, government to determine the methods and precision for assessing risk. We will then develop, in collaboration with insurance businesses, the sugarcane industry and government stakeholders, a technically sound and robust system where the negative impact of practice change on cane yield is distinguished from the year-to-year yield variability. We will pilot (and improve) this system with collaborating farmers, mills insurance businesses and, potentially, government in the wet tropics so that the framework can be operationalised by insurance businesses."}
- {"title":"NESP TWQ Project 2.3.1 - Benthic light as ecologically validated GBR wide indicator for water quality: drivers, thresholds and cumulative risks, 2016-2018 (AIMS)","recordAbstract":"The project will develop a water quality indicator based on benthic irradiance (the amount of light penetrating to the seafloor). Using experiments and field data we will develop irradiance thresholds for measures of ecosystem health, and develop prototype guideline values. The project will develop a new remote sensing algorithm of benthic irradiance, validated against open-water irradiance data. The project will quantify benthic irradiance throughout the GBR, near-daily over 14 years, and assess region-specific drivers of trends including river discharges. The indicator can directly feed into Reef Plan report cards, irradiance as a limiting factor, and about cumulative risks in the context of coral bleaching."}
- {"title":"NESP TWQ Project 3.11 - Monitoring and adaptively reducing systemwide governance risks facing the GBR, 2015-2015 (JCU)","recordAbstract":"Australian governments have addressed water quality issues in the Great Barrier Reef (Reef) over the last decade. While much has improved, more is needed. Reef environmental outcomes, however, depend on the interplay among diverse/fragmented governance “activities” (e.g. water allocation, ports-planning, regional NRM). Despite being recognized in the Reef 2050 Long-Term Sustainability Plan (LTSP), there is no coordinated system for benchmarking/monitoring the health of the overall Reef governance system/constituent activities. NERP supported a new method for doing so. This project both delivers short term influence over key Commonwealth and State (i.e. GBR Taskforce) decisions regarding management and investment and engages new LTSP implementation/review structures and stakeholders to build commitment to institutionalizing this method over the longer. Outputs will be directly integrated into and inform five-yearly Outlook reporting."}
- {"title":"NESP TWQ Project 4.5 - Guidance system for resilience-based management of the Great Barrier Reef, 2018-2020 (UQ)","recordAbstract":"Reefs vary in their risk of damage, recoverability, and responsiveness to management. Deciding where to prioritise action to maximise reef health is complex. This project delivers a guidance system to implement Resilience-Based Management and demonstrates its application in the Whitsunday and Cairns regions. The guidance system will constitute a desktop software that enables users to prioritise which reefs to manage, and potentially restore, in order to maximise ecological and socio-economic outcomes. Outputs will help GBRMPA (1) make tactical and dynamic decisions; (2) provide scenarios of reef futures to support the 2019 Outlook reporting, (3) support RIMReP by identifying target reef recovery rates; and (4) contribute to the Integrated Pest Management system to control COTS."}
- {"title":"NESP TWQ Project 2.2 - A tradable permit scheme for cost effective reduction of nitrogen runoff in the sugarcane catchments of the Great Barrier Reef, 2015-2016 (GU)","recordAbstract":"This project will undertake a scoping study to design a pilot nitrogen trading scheme for key cane growing catchments draining into the Great Barrier Reef Lagoon. The study will synthesise the current understanding of nitrogen dynamics, local expertise and on-ground practices from the cane industry, with lessons from successful nutrient trading programs elsewhere. Tradable permit simulation will estimate the cost effectiveness of the scheme for reducing nitrogen loads into the GBR, and the financial impact on sugarcane growers. Core enablers will be identified and key steps for implementation will be formulated, including governance structure and monitoring mechanisms."}
- {"title":"NESP TWQ Project 2.1.8 - Improved water quality outcomes from on-farm nitrogen management, 2016-2018 (UQ)","recordAbstract":"The sugar industry occupies 350,000ha in Reef catchments, applied 58,000t of nitrogen (N) fertilizer in 2014 and is a major contributor of dissolved inorganic nitrogen (DIN) to Great Barrier Reef receiving waters. There are many potential mechanisms for reducing on-farm N- usage. However, the comprehensive review of N use in sugarcane (SRA/DoE 2014) identified widespread over-use of N fertilizer and recommended adopting production unit yield potential (PUYP) combined with enhanced efficiency fertilizers (EEFs) to reduce ’surplus N’ (where applied N>crop requirements). This project will combine with existing farm trials at identified N loss ‘hot spots’ to test PUYP as the basis for determining fertilizer N rates and compare EEFs with standard N fertilizers for minimizing N losses, and to examine the water quality benefits that derive from such practice changes. Productivity, economic and environmental indicators will validate these strategies for reducing surplus N and produce recommendations for enhanced BMP’s."}
- {"title":"NESP TWQ Project 2.3.3 - Building Indigenous livelihood and comanagement opportunities in the northern GBR–ecosystem services and conservation governance for water quality, 2016-2017 (CSIRO)","recordAbstract":"This project supports Indigenous co-management and livelihoods by scoping and developing culturally-appropriate ecosystem services (ES) products focused on water quality. Local and regional Indigenous development agencies in CYP will collaborate with researchers with expertise in Indigenous water, co-benefits, ES, wetland ecology, and governance issues. The project will:\ni) evaluate international examples of nutrient offsets and watershed ES;\nii) scope investor demand and develop innovative water quality ES products suitable for Northern GBR geographic, demographic, and market conditions; and\niii) improve wetland protection, co-management, business, and governance capability.\nKey project objectives are to leverage existing ES-based livelihood opportunities and to realize social co-benefits."}
- {"title":"NESP TWQ Project 1.8 - Sub-catchment scale monitoring, modelling and extension design to support reef water quality improvement, 2015-2016 (JCU)","recordAbstract":"1. Design of a pilot sub-catchment scale monitoring, modelling and extension program, based on end-user workshop, existing risk assessments, monitoring and modelling programs, for subsequent implementation with farmer’s support to identify reef pollutant “spikes/hotspots”, their causes and the necessary areas for extension to improve management.\n2. Pilot implementation to test the design with the assistance of farmers, extension providers, etc in a particular local area to underpin future initiatives such as nutrient trading. \n3. Subsequently, implementation, monitoring and evaluation of an extension program based on\nany refinements resulting from the pilot study findings.\n4. Use of additional information from implementation as one line of evidence assisting in\ndevelopment and trialing of market based instruments."}
- {"title":"NESP TWQ Project 5.11 - Improved water quality outcomes from on-farm nitrogen management, 2019-2020 (UQ)","recordAbstract":"The sugar industry occupies 350,000ha in Reef catchments, applies >55,000t of nitrogen (N) fertilizer annually and is a major contributor of dissolved inorganic nitrogen (DIN) to Great Barrier Reef receiving waters. There are many potential mechanisms for reducing on-farm Nusage. However, the comprehensive review of N use in sugarcane (SRA/DoE 2014) identified widespread over-use of N fertilizer and recommended adopting production zone yield potential (PZYP) combined with enhanced efficiency fertilizers (EEFs) to reduce ’surplus N’ (where applied N>crop requirements). This project utilized existing farm trials at identified N loss ‘hot spots’ to test PZYP as the basis for determining fertilizer N rates and for comparing EEFs with standard N fertilizers for minimizing N losses. Water quality benefits that derive from such practice changes were evaluated. Productivity, economic and environmental indicators validated these strategies for reducing surplus N and produced recommendations for enhanced Best Management Practices."}
- {"title":"NESP TWQ Project 1.7 - Reducing sediment sources to the Reef: testing the effectiveness of managing alluvial gully erosion, 2015-2016 (GU)","recordAbstract":"Alluvial gully erosion contributes 20-40% of fine sediment from the three largest sediment contributing catchments to the GBR, yet there has been limited effort to manage this major sediment source. Cost effective reduction of sediment from these alluvial gullies requires data on effective management strategies. We will take advantage of a ‘natural experiment’ that occurred when Cyclone Ita passed over existing trial management sites in the Normanby catchment. The project will evaluate the effectiveness of different management strategies to reduce erosion from alluvial gullies. To complement this, we will collect baseline data at additional sites in the Normanby and Burdekin catchments."}
- {"title":"NESP TWQ Project 3.1.2 - Improving water quality for the Great Barrier Reef and wetlands by better managing irrigation in the sugarcane farming system, 2017-2019 (JCU)","recordAbstract":"In pursuit of delivering multiple benefits across multiple ecosystems such as freshwater estuaries, wetlands and reefs, this project will work in partnership with industry, extension, NRM, research and government organizations to develop and deploy an irrigation system that is automatically controlled by remotely accessing feedback from the IrrigWeb decision support tool. Irrigweb provides optimal irrigation schedules on a paddock-by-paddock basis by linking information about climate, soils and management regimes. If new water quality targets as specified in the revised Burdekin Water Quality Improvement Plan are to be met by 2025, it will be critical to establish pathways that enable industry partners to capitalize on new technologies."}
- {"title":"NESP TWQ Project 3.1.6 - Exploring trading in water quality credits as a cost-effective approach for managing water quality in the Great Barrier Reef, 2017-2019 (GU)","recordAbstract":"This project will scope opportunities for water quality credit trading, and develop trading frameworks for managing nitrogen and sediment along the Reef coast. The objective is to determine whether trading in water quality credits can cost-effectively offset emissions increases from future economic expansion, whilst ensuring that end-of-catchment pollution loads stay within designated nitrogen and sediment limits. The project will also estimate how revenues from credit trading could potentially stimulate rural economies and create jobs by incentivising innovative business opportunities."}
- {"title":"NESP TWQ Project 2.3.2 - ‘Human sensors’ for monitoring GBR environmental changes and quality of marine waters through harnessing Big Data analysis, 2016-2017 (GU)","recordAbstract":"This project will take a novel approach to improving monitoring of environmental and aesthetic conditions in real time by capitalising on information provided through micro-blogs from visitors to the Great Barrier Reef. The data mining will integrate human sensing data (e.g. twitter) with existing monitoring data (including the ‘eye on the reef’), meteorological data, tourism statistics, and others dispersed data sources and a cost-effective monitoring tool will be made available to stakeholders. All Great Barrier Reef stakeholders will benefit greatly from this innovative monitoring system."}
- {"title":"NESP TWQ Project 1.6 - Multiple and cumulative impacts on the GBR: assessment of current status and development of improved approaches for management, 2015-2016 (AIMS)","recordAbstract":"This project will synthesize experimental and field data from NERP, MTSRF and other work for key coral reef organisms and processes to produce a quantitative approach or how multiple pressures lead to cumulative impacts on the GBR. Applying quantitative tools developed for ecotoxicology and water quality guidelines, we will investigate critical interactive effects, environmental thresholds and their uncertainties, and their application in risk assessments. In addition, we will develop a roadmap that clearly articulates the steps towards a management framework to assess and manage the cumulative impacts of multiple local stressors within the context global pressures on the GBR."}
- {"title":"NESP TWQ Project 5.3 - Benthic light as ecologically-validated GBR-wide indicator for water quality: Drivers, thresholds and cumulative risks, 2019-2020 (AIMS)","recordAbstract":"The project is developed a water quality indicator based on benthic PAR (light penetrating to the seafloor). The project experimentally estimated irradiance thresholds for ecosystem health for the Great Barrier Reef and developed a new remote sensing algorithm to estimate and map benthic irradiance throughout the GBR. This fed into Reef Plan report cards, RIMReP monitoring, and assessments of drivers of cumulative risks. The project extension focused on: work with stakeholders to embed the products into their workflows; improved the remote sensing algorithm with seasonal and regional cloud corrections; and evaluated an additional benthic light product based on the eReefs models to complement the remote sensing product."}
- {"title":"NESP TWQ Project 5.7 - Assessment and communication of the spatial variability in bleaching severity throughout the Great Barrier Reef following back-to-back bleaching events in 2016 and 2017 (FAST TRACK PROJECT), 2018-2019 (AIMS)","recordAbstract":"The analysis of existing bleaching observations and data resulted in three key outcomes: identification of key bleaching patterns, analysis of contributing factors, and recommendations for future monitoring and mitigation strategies.\n\nThis desktop analysis of existing bleaching observations and data delivered three key outcomes:\n\n1. a quantitative assessment of the spatial variability of severe coral bleaching and mortality throughout the Great Barrier Reef (GBR) on regional and within individual reef scales,\n2. a quantitative comparison of bleaching observations from a range of observers AIMS, GBRMPA, JCU Centre of Excellence and the GBRMPA COTS control team (implemented by AMPTO) which used a variety of methods and spatial assessments\n3. clear science communication and engagement with key stakeholder groups (tourist operators, reef managers and media outlets) in an effort to improve the communication and understanding of the variability and the spatial impacts of coral bleaching throughout the GBR.\n\nThis project extended on temperature logger analysis performed in NESP TWQ Project 4.2."}
- {"title":"NESP TWQ Project 5.10 - Development and application of automated tools for high resolution gully mapping and classification from LiDAR data, 2019-2020 (GU)","recordAbstract":"Accurately mapping gullies at high resolution and quantifying their key attributes is the critical first step in the process of prioritising and designing rehabilitation solutions. At least 40% of the accelerated erosion that is contributing to poor water quality in the Great Barrier Reef (GBR)Lagoon is sourced from gully erosion, demanding effective management and rehabilitation of these features. Current gully maps across the GBR are low resolution and overly simple,providing no differentiation between gully type. Airborne Light Detection And Ranging (LiDAR) is now widely recognised as being the best way to accurately map gullies at a landscape scale at a suitable resolution for management planning. Given the large volume of LiDAR data now becoming available, this project will develop and apply automated tools to enable the location of gullies to be extracted from LiDAR Digital Elevation Models (DEMs), along with key attributes of the gullies enabling them to be grouped into classes of similar gully types to aid prioritisation, management and catchment modelling."}
- {"title":"NESP TWQ Project 5.14 - Identifying the water quality and ecosystem health threats to the Torres Strait from the Fly River runoff, 2019-2020 (JCU)","recordAbstract":"Runoff from the Fly River in Papua New Guinea (PNG) influences water quality conditions in the Torres Strait region. Recent work (NESP Project 2.2.1 and 2.2.2) has clearly demonstrated that this influence is largely constrained to the northern Torres Strait, as far east as Bramble Cay and at least as far west as Boigu Island. The southern extent of influence is considered to be limited to within 40-50km of the PNG coast in the western areas, and around 80km in the eastern areas. The intensity of this influence, and the potential ecological impacts, are still not well understood. Trace metal concentrations are higher in the northern Torres Strait around Boigu and Saibai, however it is not clear whether this enrichment is natural or the result of mine derived inputs of trace metals. Further investigation is required to understand the prevalence and frequency of the extension of the Fly River plume into the northern Torres Strait, and further characterisation of plume constituents, particularly sediment and trace metals in comparison to previous results including the Torres Strait Baseline Study."}
- {"title":"NESP TWQ Project 2.3.4 - Working with Traditional Owners and local citizens to better manage GBR estuarine wetlands, 2016-2018 (JCU)","recordAbstract":"Traditional Owner rangers and local citizens of the Port Curtis Coral Coast (PCCC) TUMRA will be engaged in developing a Mangrove Management Plan (MMP) that provides a strategic basis for estuarine repair activity and maximizes water quality outcomes in the southern GBR. Development of this MMP will build capacity within the Gidarjil Development Corporation (GDC) and local community to undertake scientifically-rigorous, ecological monitoring and assessment. These management and rehabilitation strategies will protect sea country resources through partnerships between community, scientists and NRM agencies. The MMP will enable rangers and citizen scientists to conduct scientifically valid surveys of estuarine monitoring, management and rehabilitation within the PCCC TUMRA area."}
- {"title":"NESP TWQ Project 4.12 - Measuring cost-effectiveness and identifying key barriers and enablers of lasting behavioural change in the cane industry., 2018-2020 (GU)","recordAbstract":"This project aims to develop methodologies for assessing cost-effectiveness and identifying key drivers of variation in cost-effectiveness in challenging data situations. It will use these methods to evaluate the cost-effectiveness of various completed programs aimed at reducing nitrogen runoff from cane production in Reef catchments. Additionally, the project will identify key barriers and enablers of engagement and lasting behavioral change within recent and current programs. It will compare and contrast different evaluation methods to create an adaptive management evaluation tool for measuring engagement during ongoing programs. Ultimately, the project seeks to inform future investment decisions by identifying characteristics of cost-effective projects that successfully engage stakeholders and promote lasting behavior change.\n\nIn summary, this project will:\n\n1. Develop methodologies for assessing cost-effectiveness and for identifying key drivers of variation in cost-effectiveness in data-challenging situations \n2. Use developed methods to evaluate the cost-effectiveness of a range of completed programs for reducing nitrogen runoff from cane production in Reef catchments\n3. Within recently-completed and current programs, identify key barriers and enablers of:\n a. Engagement\n b. Lasting behavioural change\n4. Compare and contrast evaluation methods (targeted individual approach compared and contrasted with a within project stakeholder approach) to deliver an adaptive management evaluation tool for measuring engagement whilst programs are on-going.\n5. Inform future investment decisions by helping to identify key characteristics of cost-effective projects that will successfully engage stakeholders to deliver lasting behaviour change."}
- {"title":"NESP TWQ Project 2.2.1 - Identifying the water quality and ecosystem health threats to the high diversity Torres Strait and far northern GBR from runoff from the Fly River, 2016-2017 (JCU)","recordAbstract":"Runoff from the Fly River in Papua New Guinea influences water quality conditions in the Torres Strait (TS) region however the extent and frequency of this influence, and the potential ecological impacts, are not well understood. Further investigation is required to understand the prevalence and frequency of the extension of the Fly River plume into TS, and the characteristics of plume constituents, particularly metals. This project will build on previous efforts to determine the spatial extent, temporal patterns and constituent pollutants of Fly River discharge, and to a lesser extent, assess the vulnerability of ecosystems in the TS exposed to the discharge."}
- {"title":"NESP TWQ Project 4.1 - Crown-of-thorns starfish: surveillance and life history, 2018-2019 (CSIRO)","recordAbstract":"This project supports the implementation of the NESP Crown-of-Thorns Starfish Integrated Pest Management Project’s management and research strategy by;\n\ni) describing ecological parameters key to parameterizing the tools underpinning the management strategy;\nii) analysing existing data sets to assess management performance and describe the interaction between CoTS and bleaching; and\niii) scoping new technologies and surveillance strategies for detecting and monitoring primary and secondary outbreaks. \n\nThe work will involve a combination of field ecological research, statistical analysis of existing data, technology and strategy development (the latter through workshops) and inform decision making through incorporation into decision support tools and recommendations."}
- {"title":"NESP TWQ Project 2.1.10 - The application and adaption of mine site rehabilitation approaches to alluvial gully rehabilitation in the Bowen Catchment, 2016-2017 (GU)","recordAbstract":"This project will develop the partnerships and the institutional framework for implementing large scale innovative rehabilitation works which aim to directly reduce sediment supply from the large alluvial gullies on the lower Bowen River. These gullies are the largest single source of suspended sediment loads into the Great Barrier Reef (GBR). The project will work directly with Glencore and Q Coal, who are some of the largest grazing landholders along the section of the Bowen River with the highest concentration of large alluvial gullies. The central premise underpinning the strategy is that alluvial gully rehabilitation is more akin to mine site rehabilitation, and such techniques are more appropriate for tackling this major GBR sediment source than grazing BMPs. The strategy aims to draw upon the mine site rehabilitation experience and expertise within these two major Queensland mining companies, applying and adapting mine rehabilitation approaches to the rehabilitation of alluvial gullies."}
- {"title":"NESP TWQ Project 2.1.2 - Scoping options for low-lying, marginal cane land to reduce DIN in priority wet tropics catchments, 2016-2017 (JCU)","recordAbstract":"This project will explore alternative land use options to reduce nitrogen losses from marginal sugarcane land in priority wet tropics catchments. The Wet Tropics Water Quality Improvement Plan (WQIP) identified that complete adoption of sugarcane best management practices would be insufficient to achieve the nitrogen load reductions needed to meet the Great Barrier Reef (GBR) Water Quality Guidelines. We will map low-lying, marginal cane land with community and industry partners, identify possible alternate uses, quantify the economic costs and benefits of land transition (in terms of alternate income streams), identify constraints and opportunities for alternative land uses to reduce nitrogen."}
- {"title":"NESP TWQ Project 1.2 - Developing an approach to evaluate the effectiveness of investments in riparian management in the GBR catchments, 2015-2016 (CSIRO)","recordAbstract":"The current tools used to estimate the contribution of bank erosion to the Great Barrier Reef (i.e. SourceCatchments model), are based on empirical relationships using little or no data from tropical river systems. This project proposes to develop a revised methodology for estimating (a) the natural or bench-mark rates of bank erosion in tropical rivers (b) how this information can be coupled with improved data sets on channel morphology, site connectivity and sediment particle size to develop a more robust approach for identifying sites amendable to remediation and (c) where riparian restoration has occurred, evaluate the effectiveness of the remediation."}
- {"title":"NESP TWQ Project 3.3.2 - Science evaluation of coastal wetland systems repair projects across GBR catchments, 2017-2019 (JCU)","recordAbstract":"State and Federal agencies are funding many GBR wetland system repair projects (Mungalla wetlands $1.2M; Reef Trust/Greening Australia $4M; Restoring Burdekin Coastal Ecosystems $837K; Roundhill Creek wetland/FHA $65K, Babinda Swamp Constructed Wetland ~$1.97M). The problem is no scientific data evaluates their success; this project partners with NRMs to fill this R&D gap. Using advanced scientific hydrological and ecological techniques we will generate data to evaluate repair efforts, providing surety to government funding agencies. This project will provide a platform to attract significant private and philanthropic investors, looking to fund large-scale wetland repair projects, via emerging carbon and nutrient trading schemes."}
- {"title":"NESP TWQ Project 3.2 - Improving historical estimates of abundance and distribution of dugongs and large green turtles in western and central Torres Strait, 2015-2016 (JCU)","recordAbstract":"This project will improve the accuracy of aerial survey estimates of the size and distribution of dugong and green turtle populations in western and central Torres Strait by: (1) collecting and analysing data on their movements and diving behaviour, and (2) estimating the proportion of turtles seen during aerial surveys that are the large female green turtles harvested by Indigenous hunters. These data will then be used to (re)estimate the size and distribution of the populations of dugongs and harvestable green turtles in Torres Strait by (re) analysing historical aerial survey data collected in 2001, 2005, 2006, 2011 and 2013."}
- {"title":"NESP TWQ Project 2.1.7 - Engaging with farmers and demonstrating water quality outcomes to create confidence in on-farm decision-making (“Project 25”), 2016-2018 (JCU)","recordAbstract":"Recent global experiences suggest that spatially identifying and prioritizing landscape ‘hotspots’ of pollutant generation for management intervention, and small catchment-scale water quality monitoring in collaboration with landholders linking water quality with specific management practices, are among the most promising strategies for reducing water quality pollution. This project will combine recent hotspot identification in GBR sugarcane catchment of the Russel/Mulgrave with targeted cane farmer interaction activities (related to sub-catchment and localized monitoring activities), focusing on emerging monitoring technologies (real-time water quality monitoring) to link farmer on-farm practices with feedback from sub- catchment water quality measurements. The use of both scientific and citizen science monitoring approaches will deliver robust feedback loops to enable farmers to directly link their activities with water quality conditions. The project will focus on on-farm practice improvements in highest priority catchments to achieve maximum benefits to GBR health from catchment management actions."}
- {"title":"NESP TWQ Project 3.8 - Towards an integrated monitoring program: identifying indicators and existing monitoring programs to cost effectively evaluate the Long Term Sustainability Plan, 2015-2015 (AIMS)","recordAbstract":"This project addresses a series of critical initial steps required to develop a cost-effective integrated monitoring program. First, environmental, social and economic elements and indicators will be identified that could be monitored to enable an integrated evaluation of the Long Term Sustainability Plan (LTSP) targets. Second, existing monitoring programs will be evaluated against the newly developed LTSP targets, to ensure that the relevant aspects of these monitoring programs are considered for inclusion in an integrated monitoring program. Finally, the statistical performance of the AIMS Long Term and Marine Monitoring Programs will be evaluated to illustrate how these programs could cost-effectively contribute to an integrated monitoring program."}
- {"title":"NESP TWQ Project 4.10 - Evaluating the costs and benefits of agricultural land conversion to wetlands, 2018-2020 (JCU)","recordAbstract":"Government (e.g. Major Integrated Projects, MIPs) and private investors (e.g. Kilter Rural Group, WWF, and Greening Australia) are increasingly interested in nitrogen reduction projects, particularly via conversion of land to wetlands. Investing in such projects requires understanding the environmental benefits to be accrued and cost-effectiveness. The best way to provide these data is to evaluate already constructed land-wetland conversion sites that resemble what future projects might look like. This project will collect data from previously completed land-wetland conversion sites, on construction and ongoing maintenance costs, and the water quality and biodiversity benefits. In doing so it will provide explicit data for government and private investors to make informed decisions on future investments of this kind."}
- {"title":"NESP TWQ Project 3.2.1 - Deriving ecologically relevant load targets to meet desired ecosystem condition for the Great Barrier Reef: a case study for seagrass meadows in the Burdekin region, 2017-2019 (JCU)","recordAbstract":"This project will derive ecologically relevant targets (ERTs) for water quality and sediment loads by: 1) defining seagrass desired state targets; 2) calculating water quality guidelines (light); and 3) calculating ERTs for terrestrially sourced sediment loads. Historical and new data collections will be used to derive ERTs via statistical models and eReefs (RECOM), and the seagrass sub-model in eReefs will be used to test ERTs. A framework for setting seagrass desired state will be developed for the entire GBR and water quality guidelines and sediment load ERTs will be quantitatively defined for the Burdekin basin where suspended sediments affect seagrass condition."}
- {"title":"NESP TWQ Project 5.4 - Deriving ecologically relevant targets to meet desired ecosystem condition for the Great Barrier Reef: A case study for seagrass meadows in the Burdekin region, 2019-2020 (JCU)","recordAbstract":"This project derived Ecologically Relevant Targets (ERTs) for sediment loads for the Burdekin basin and provided the seagrass desired state across the Great Barrier Reef (GBR) by;\n\n1. defining seagrass desired state for the GBR;\n2. calculating light requirements; and\n3. calculating ERTs for terrestrially sourced sediment loads, using Cleveland Bay as a case study.\n\nHistorical and new data collections were compiled and used to derive ERTs via statistical models and eReefs Relocatable Coastal Model (RECOM), and the seagrass submodel in eReefs was used to test ERTs."}
- {"title":"NESP TWQ Project 2.1.6 - From exposure to risk: novel experimental approaches to analyze cumulative impacts and determine thresholds in the GBRWHA, 2016-2018 (AIMS)","recordAbstract":"Understanding cumulative impacts from multiple stressors will be critical for successful management of the GBR under the Reef2050 Plan. The project will produce experimental analyses of concentration-response relationships for selected species under broad, controlled envelopes of sediments, turbidity, nutrients, light, salinity and temperature. Based on new understanding of threshold exposure values, existing and new field data we will produce exposure maps for individual stressors and explore techniques to summarize those into cumulative exposure maps. Results will inform spatial and temporal assessments of ecological risks, and management opportunities for a range of activities in the coastal zones and inshore GBR waters."}
- {"title":"NESP TWQ Project 2.1.4 - Demonstration and evaluation of gully remediation on downstream water quality and agricultural production in GBR rangelands, 2016-2018 (CSIRO)","recordAbstract":"This project will evaluate the cost, effectiveness and biophysical processes of gully remediation options in the Burdekin Region. Sub-surface soil erosion is the major source of anthropogenic sediment delivered to the Great Barrier Reef and must be addressed to help meet Reef water quality targets. The Reef Trust Gully Erosion Control Programme is the first to focus on gully remediation. This study will evaluate and communicate the impact of gully remediation options to underpin future investor, stakeholder and public confidence in the impact of erosion control programmes on (i) water quality (ii) project cost-effectiveness and (iii) agricultural production."}
- {"title":"NESP TWQ Project 3.9 - Indigenous capacity building and increased participation in management of Queensland sea country, 2015-2015 (CSIRO)","recordAbstract":"This project intends to facilitate targeted consultations with key individuals and institutions (i.e. Torres Strait Regional Authority, GBR TO’s and Land Councils, etc.) to seek feedback on the implementation of the NESP TWQ Hub Indigenous Engagement and Participation Strategy (IEPS). This will enable the evolution of a strong Implementation Strategy for the IEPS. A number of Indigenous community liaison officers (part-time) will be engaged to work at the local level to analyse, scope and prioritise Indigenous specific targets/actions identified within and arising from the 2050 LTSP and to inform future TWQ Hub research priorites (the Research Plan). The project will set the parameters for, and commence development of an Indigenous specific Implementation Strategy and investment framework for the future co-management of sea country."}
- {"title":"NESP TWQ Project 5.15 - eAtlas extension: Data management for environmental research, 2019-2021 (AIMS)","recordAbstract":"The eAtlas is a free public website (http://eatlas.org.au) that brings together environmental research data and knowledge from multiple organizations and research programs into one place. It ensures that research data is discoverable, well documented, accessible and reusable now and into the future. \nIn goal of this project was for the eAtlas team to work with National Environmental Science Program Tropical Water Quality (NESP TWQ) hub researchers to:\n\n- Assist and support them with data management.\n- Ensure that data produced by the hub projects was published through the eAtlas.\n- Provide online visualization of the hub's spatial datasets.\n\nThe eAtlas also worked closely with the GBRMPA: Reef knowledge team on the development of a prototype information delivery system for the Reef 2050 Integrated Monitoring and Reporting Program (RIMReP)."}
- {"title":"NESP TWQ Project 3.5 - Assessment of key dugong and turtle seagrass resources in the northern Torres Strait, 2015-2016 (JCU)","recordAbstract":"This project fills a critical information gap for dugong and turtle habitat management in the Torres Strait. It describes seagrasses in a recently identified data deficient region in northern Torres Strait that contains large dugong and turtle populations and is the subject of a proposed extension of the existing Dugong Sanctuary. The baseline assessments will form the foundation for ongoing monitoring, and provide essential information to the TSRA, Australian and Queensland governments for dugong and turtle management plans, complimenting dugong and turtle research studies in the region and building skills and capacity of Traditional Owners and Rangers."}
- {"title":"NESP TWQ Project 3.7 - Monitoring the effects of zoning on coral reefs and their associated fish communities in the GBR Marine Park, 2015-2015 (AIMS)","recordAbstract":"This project describes the activities of the AIMS long-term program to monitor the effects of zoning on coral reef communities in the period July-October 2015. \n\n1. In that period there will be one survey trip (out of four made annually) to the southern GBR (Capricorn-Bunker and Swain Reefs) using the RV Cape Ferguson. As well as forming part of the long-term program, these reefs are interesting as they are recovering from the effects of severe storms, notably TC Hamish in 2009.\n2. Initial findings will be reported to stakeholder via a “Survey update”, with more comprehensive reporting when surveys of reefs in all regions are complete. (June 2016)"}
- {"title":"NESP TWQ Project 2.1.5 - What’s really damaging the Reef? Tracing the origin and fate of the environmentally detrimental sediment, 2016-2018 (JCU)","recordAbstract":"Recent research has shown that only a portion of the fine sediment fraction delivered from rivers draining into the Great Barrier Reef Lagoon (GBRL) reaches coral reefs and seagrass meadows. The specific sources of this sediment, which affects the health of corals and seagrasses, are as yet unresolved. This project will, for the first time characterise and trace the origin(s) and fate of this environmentally detrimental sediment using samples collected in flood plumes and during resuspension events. This will enable direct spatial targeting of the sources of this material to achieve maximum benefits to GBR health from catchment management actions."}
- {"title":"NESP TWQ Project 5.6 - Designing the Aesthetics Long Term Monitoring Program (ALTMP), 2019-2020 (CSIRO)","recordAbstract":"Aesthetic condition and trend of the Great Barrier Reef (GBR) are critical to monitor for the Reef 2050 Integrated Monitoring and Reporting Program (RIMReP), and World Heritage Area reporting. This research project designed and implemented an aesthetics long term monitoring program (ALTMP) for the GBR. It included a strong research component that identified how to convert a subjective measurement into an objective one. Baseline data was also provided to represent a snapshot of aesthetic condition at a large number of below-water and above-water sites within the GBR, and for a range of stakeholders.\n\nThis project builds on the work undertaken by:\n\n- NESP TWQ Project 3.2.3 - Monitoring aesthetic value of the GBR by using artificial intelligence to score photos and videos\n- NESP TWQ Project 3.2.4 - Defining, assessing and monitoring Great Barrier Reef aesthetics"}
- {"title":"NESP TWQ Project 5.1 - Matching the Crown-of-Thorns Starfish Integrated Pest Management to the scale of the new Control Program, 2019-2020 (CSIRO)","recordAbstract":"The CoTS IPM program designed an ecologically informed control program that integrates knowledge of the spatial and temporal dynamics of CoTS outbreaks and the operations of onwater control to provide:\n\n1. the most efficient strategies for investing management effort at all scales of management;\n2. an operational framework for the control program, and, iii) to identify and fill key research gaps.\n\nThis project supported the expansion of the IPM’s tools to match the expansion of the control program, finalized scenario testing to assess appropriate control objectives, and, assessed the social benefits of the CoTS training program."}
- {"title":"NESP TWQ Project 4.13 - Assessing the Gulf of Carpentaria mangrove dieback, 2018-2020 (JCU)","recordAbstract":"In early 2016, extensive dieback of mangrove forests was recorded along the southern and western Gulf of Carpentaria coastline. Landsat analysis suggests that 7,400 hectares of mangrove forest suffered dieback over a relatively short and synchronous time period around November 2015, along a >1,000km wide front from Karumba in the east to Limmen River in the west. Recent field visits to a limited range of affected sites suggest that a relatively low percentage of trees have recovered and most are dying/dead. This is the largest event of natural dieback of mangroves ever recorded in the world. This project will provide a survey, description and analysis of the extent of the dieback across its range, as well as examining patterns of dieback. The assessment will include training and participation of local Indigenous ranger groups in mangrove assessment and monitoring methods, as well as providing recommendations for recovery, potential intervention, future monitoring and further studies. A synthesis workshop will also be held to present the findings of the assessment to a wide audience."}
- {"title":"NESP TWQ Project 3.2.5 - Testing and implementation of the water quality metric for the 2017 and 2018 reef report cards, 2017-2017 (AIMS)","recordAbstract":"Report cards are used at various levels to summarise and communicate complex information on GBR health. The effectiveness of Reef Plan is communicated through the annual Reef Report card. In the Reef Report Card, marine water quality is reported using a metric, developed in 2009, based on satellite remote sensing of near surface concentrations of chlorophyll and total suspended solids. This provides a wide spatial and temporal coverage of marine water quality.\n\nHowever, the current water quality metric has a number of issues such that the Independent Science Panel has recently expressed a lack of confidence in it and suggested that a new approach was needed. This proposal outlines a research program to deliver elements of this new approach."}
- {"title":"NESP TWQ Project 2.1 - Assessing the cumulative impacts of climatic disturbances on inshore GBR coral reefs, identifying key refuges and testing the viability of manipulative reef restoration, 2015-2016 (JCU)","recordAbstract":"The Keppel Islands, southern GBR, suffered successive climatic disturbance events (coral bleaching, flood plumes) between 2006 and 2013. Long-term monitoring at 26 sites revealed significant declines in coral cover and fish abundance on both no-take reserve (green zone) and fished reefs. In February 2015, Cyclone Marcia (Category 5) hit the Keppel Islands. We propose to re-survey all 26 monitoring sites to quantify cyclone damage and to identify remaining refuge areas that can support reef recovery and long-term resilience. We also propose to conduct a pilot-scale experiment on degraded reefs in the Keppel Islands to assess the viability of active reef restoration."}
- {"title":"NESP TWQ Project 5.13 - Coastal wetland systems repair across GBR catchments – values based causal framework validation, 2019-2020 (JCU)","recordAbstract":"Conservation and repair of the coastal wetland ecosystems’ in the Great Barrier Reef catchments have come into focus following media converging on the point that the reef health and land use in catchments has been compromised. While on-ground wetland repair investment activities are underway, data to demonstrate water quality and biodiversity return for the investment is not available. Here we continue working with project partners, further contributing to change management practices, consolidate new project partnerships, and road test the Queensland Wetlands Values Based Causal Framework using existing and new data."}
- {"title":"NESP TWQ Project 5.8 - What’s really damaging the Reef? Tracing the origin and fate of the environmentally detrimental sediment and associated bioavailable nutrients, 2019-2020 (JCU)","recordAbstract":"Recent research has shown that only a portion of the fine sediment fraction delivered from rivers draining into the Great Barrier Reef Lagoon (GBRL) reaches coral reefs and seagrass meadows. The specific sources of this sediment, which affects the health of corals and seagrasses, are as yet unresolved. This project, for the first time, characterised and traced the origin(s), fate and nutrient bioavailability of this environmentally detrimental sediment using samples collected in flood plumes and during resuspension events. This enabled direct spatial targeting of the sources of this material to achieve maximum benefits to GBR health from catchment management actions."}
- {"title":"NESP TWQ Project 3.2.3 - Monitoring aesthetic value of the Great Barrier Reef by using artificial intelligence to score photos and videos, 2017-2018 (GU)","recordAbstract":"This project addresses the urgent need to understand and monitor the aesthetic value of the Great Barrier Reef. Focusing on the fast-changing underwater systems of the Reef, this research will use advanced technology (including eye tracking and heart rate measurement) to elicit what environmental and experiential attributes contribute to aesthetic value. A Big Data platform using artificial intelligence will be created to assess large volumes of visitor supplied imagery and to map aesthetic value across space and time."}
- {"title":"NESP TWQ Project 1.9 - The establishment of a future NESP dredging research investment framework, 2015-2015 (AIMS)","recordAbstract":"The project will conduct an inclusive facilitated workshop with key researchers and stakeholders to identify the future knowledge needs for improved management of dredging activities in the GBR. Building upon the recent dredging synthesis and other resources, this workshop will distill a clear, prioritized research framework to inform future NESP investment into dredging research. The framework will: (i) define the scope of work required to develop and apply improved sediment transport models for the GBR lagoon, (ii) identify and quantify the type and extent of ecological impacts, especially of maintenance dredging activities and (iii) identify management options including innovative amelioration approaches."}
- {"title":"NESP TWQ Project 1.1 - Establishing the future NESP CoTS research framework including an ecologically based approach to the management of CoTS at multiple scales, 2015-2015 (CSIRO)","recordAbstract":"This project will lay the foundations for the development of a reliable CoTS surveillance and control program based on detailed understanding of i) CoTS ecology, population dynamics and movement, ii) the CoTS control program’s capabilities and constraints, and, iii) IPM principles. In the project’s initial phase a COTS Integrated Pest Management (IPM) Workshop will be conducted. This workshop will bring together managers and researchers with purpose of defining a tactical approach to current COTS management and a strategic approach for the management of future outbreaks.\n\nThis will be achieved through the development of management-focused qualitative models of the CoTS/control system. These models will be used to identify key system components and associated knowledge gaps and will provide the logical structure of a future quantitative simulation model to test and compare alternative management scenarios. These two frameworks, and the data needs identified to operationalise them, will form the basis for the development of a COTS Strategic Research plan. It is envisaged this Project will lead into the COTS IPM Program and provide the direction for COTS research under future NESP investment."}
- {"title":"NESP TWQ Project 3.1.3 - Harnessing the science of social marketing in communication materials development and behaviour change for improved water quality in the GBR: a desktop review (Project 2.1.3 - Stage 2), 2017-2017 (JCU)","recordAbstract":"This project extends project 2.1.3 which contains an analysis of communications to land holders for the Reef Trust Tender – Burdekin and The Reef Programme concerning readability, message framing, message tone and visual imagery, factors that significantly impact on message acceptance, engagement and adoption of recommended behaviours. The analysis identified that: 1. Material is written in too complex language; 2. Message tone may be a barrier; and 3. Visual imagery may have unintended effects. These findings have implications across wider programs and there has been considerable interest in extending this analysis to assist in developing and revising foundational material and messages."}
- {"title":"NESP TWQ Project 3.1 - Seagrass mapping synthesis – A resource for marine park and coastal management, 2015-2015 (JCU)","recordAbstract":"Key to understanding the desired state of Queensland seagrasses is reliable data on seagrass distribution, abundance and species composition, and how this changes through time. Also valuable is the ability to reliably “drill” down from large-scale (World Heritage Area) to small-scale estuaries and meadows. TropWATER provides a composite map of seagrass for the GBRWHA available through eAtlas, GBRMPA and Pangaea. However this layer has not been updated since 2010 and is missing changes from important areas and extensive new data, and provides no meadow-specific information. This project will recompile existing GIS layers, update with 2010-2015 data, and provide meadow-specific information."}
- {"title":"NESP TWQ Project 4.8 - ‘Project 25’ – farmers, water quality and on-farm decision-making, 2018-2020 (JCU)","recordAbstract":"Landholder concerns surrounding the credibility of broad-scale water quality monitoring and modelling initiatives in the GBR catchment area is emerging as one of the key cane industry engagement challenges for promoting significant farming practice change, and delivering water quality improvements. Based around small, sub-catchment scale water quality monitoring in a key cane growing region of the GBR catchment, Project 25 utilises a bottom-up approach to integrated sub-catchment monitoring and intervention to identify ‘hot spot’ sub-catchments through localised water quality monitoring. The Project emphasises industry ownership and control of monitoring design, and delivery of locally targeted water quality data to provide confidence in on-farm decision making and practice change."}
- {"title":"NESP TWQ Project 4.3 - Best practice coral restoration for the Great Barrier Reef, 2018-2020 (JCU)","recordAbstract":"As coral cover in the Great Barrier Reef (GBR) continues to degrade, pressure is growing for direct interventions to assist the recovery of corals at important sites. A range of coral restoration and assisted recovery techniques have been trialled overseas and in Australia, however there has not been an evaluation of what will work best in GBR conditions. This project will: \n\n- Summarise and evaluate the success of coral restoration and assisted recovery techniques worldwide and identify the techniques most likely to help the GBR. \n- Experimentally test the most promising techniques. \n- Come up with best practices for post-impact coral reattachment and reorientation. \n- Explore options for training courses, offset models and Indigenous employment."}
- {"title":"NESP TWQ Project 3.10 - Benchmarking costs of NRM improvements for the GBR, 2015-2015 (CQU)","recordAbstract":"This project aims to provide information on cost benchmarks for key management actions to improve water quality into the GBR. The project involves a review and evaluation of summary data about NRM projects that have been funded recently to address water quality issues. By pooling the data across NRM regions and different activities, it will be possible to identify the distribution of cost/outcome ratios. From this, potential benchmarks can be established (e.g. 75% of sediment reduction actions are less than $xxx/tonne, 95% are less than $XXX per ton). It also provides some identification of the most cost-effective strategies across actions and regions."}
- {"title":"NESP TWQ Project 4.11 - Sources, transformations and fate of particulate and dissolved organic carbon – implications for the GBR, 2018-2018 (GU)","recordAbstract":"Organic carbon has traditionally been poorly studied in marine systems, but recent studies suggest that GBR microalgae can utilise organic matter, and that eroded soil carbon parameters can ameliorate marine algal responses to catchment nutrients. This suggests that organic carbon may play a more important role in marine ecosystems than previously thought. Additionally, GBR organic carbon concentrations are increasing, but the mechanisms are unclear. The proposed study would review the literature, develop a conceptual model, and undertake data analysis on organic carbon in the GBR and catchments, and examine links to ecosystem effects. This will improve monitoring and management of water quality in the GBR."}
- {"title":"eAtlas THREDDS service (AIMS)","recordAbstract":"The eAtlas delivers its NetCDF (Network Common Data Form) data file using a THREDDS Data Server (TDS), which provides metadata and data access using OPeNDAP, OGC WMS and WCS, HTTP, and other remote data access protocols.\n\nThe services delivers data, matadata and map layers associated with the eAtlas project (https://eatlas.org.au). The data focus on environmental research on the Great Barrier Reef and its neighbouring coast, the Wet Tropics rainforests and Torres Strait. The map layers served by the WMS service can be used to create environmental maps when combine with other dataset such as the layers provided by the eAtlas Web Mapping Service (https://eatlas.org.au/data/uuid/71127e4d-9f14-4c57-9845-1dce0b541d8d).\n\nThis web map service is predominantly set up and maintained for delivery of visualisations through the eAtlas mapping portal (https://maps.eatlas.org.au). Other portals are free to use this service with attribution, provided you inform us with an email so we can let you know of any changes to the service.\n\nThis THREDDS Data Server software is hosted on a Amazon Web Services (AWS) server. Associated with each NetCDF dataset, there is a list of corresponding WMS layers, one for each data variable, which can be discovered by inspecting the corresponding GetCapabilities document. This XML document lists all the layers, a short descriptions and available rendering styles. Most WMS clients should be able to read those documents allowing easy access to all the variables for a given NetCDF dataset.\n\nThis services is operated by the Australian Institute of Marine Science and co-funded by the National Environmental Science Program Tropical Water Quality (NESP TWQ) Hub."}